Afri-Coast Engineers Projects

Projects

 
Home Page Contact Us
Projects

Projects

"Our strategic objective is to deliver world class projects that fulfill all
our customer requirements on time and within budget"

Resume of Key Projects

  • First Wind Tower Generator (WTG) in Coega IDZ,zone 9. This project entailed the construction of a Vestas V90 1,8MW wind tower generator (WTG) with a hub height of 95m and rotor blade radius of 49m. An octagon shaped concrete base of approximately 18m diameter was constructed.
  • Design and Implementation of bulk water supply projects the most notable being the design and implementation of the Lower Sundays River water scheme, for the Nelson Mandela Metro. This project won the regional SAICE award for excellence in civil engineering in 1993.
  • Routine Road Maintenance and Incident Management Systems to National Roads N2 and N10 in the Eastern Cape over a total distance of 500 km for the South African National Roads Agency, since 1998 to 2006.
  • Bridge Management, Inspections, Assessments, Rehabilitation and bridge design for the Province of Eastern Cape, South African National Roads Agency and Nelson Mandela Metro. Since 1993, and current.
  • Infrastructure Asset Management reservoir rehabilitation programmes for Mossel Bay and Cape Agulhas Municipalities, 2002
  •  Water Services Development Plans for Overberg District Municipality including GIS capability and analysis 2002
  • Coega IDZ Potable Water and Return Effluent Supply, Planning: Engineering Outline Design and Performance Specifications and design and implementation of bulk water supply infrastructure for the Coega Development Corporation (Pty) Ltd in various stages since 1997.o Design and contract administration of temporary site water installation and batch plant structural works for Nqgura Harbour Contractors at the Port of Nqgura,.2003
  • Genesis Wind Hydro Project for the Kouga Energy Company. This hybrid renewable energy project is regarded as a first of its type in the world where wind energy will be used in conjunction with a hydro-electric scheme and will be regarded as a tourist and educational attraction, 2003:
  • Design and implementation of rural water supply and sanitation schemes for Sundays River Valley, Cacadu Municipality and Blue Crane Route Municipalities. 1999-2002
  • Water Demand assessments and water audits for the Nelson Mandela Metro, Ngqusha Municipality, Bredasdorp Municipality, Cape Agulhas Municipality and Department of Water Affairs, 2000-2003
  • Concrete rehabilitation programme and upgrading of Fish Water Flats Water Reclamation Works for Nelson Mandela Metro, 2001
  • Design and implementation of concrete structural rehabilitation and preservation programmes to buildings for University of Port Elizabeth, and Pretoria Portland Cement 1997 to current
  • Upgrading of Duckpond Pavilion at St Georges Cricket Ground in preparation for the ICC Cricket World Cup 2003 for Eastern Province Cricket Board., 2003
  • Investigations into the upgrade of the Loerie Water Treatment Works mechanical equipment for Nelson Mandela Metro, 2002
  • Integrated Beachfront Development Plan for the Nelson Mandela Metropolitan Municipality, 2004-2005.
  • Vision 2020 Gateways and Beautification Project for the Nelson Mandela Metro, 2005 – current.
  • R100 million Vision 2020 Beachfront Development Projects for the Nelson Mandela Metro, 2005 – current.
  • Capital Asset Register Integrated GIS Asset Management System for the Nelson Mandela Metropolitan Municipality.
  • New state-of-the-art fresh milk production facility for Clover SA (Pty) Ltd, in Perseverance, 2006
  • New pipeline bridge over Spoornet railway cutting in the Coega IDZ, 2006-2007
22 February 2012      

Copyright © Afri-coast Engineers | Products & Services of PCW New Media ltd | Sitemap
Administrator Tools
Search Engine Optimisation Search Engine Optimisation
Alt Tags Alt Tag Manager
Editor Content Editor
Refresh Content Refresh Content